PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilled underground storm piping between column lines G-G.1 facing South (800x600).jpg Compacting soil along column line 2.5 Facing East (800x600).jpg Compacting underground Storm piping Facing North (800x600).jpg Continued installing temporary stairs and platforms Facing South (800x600).jpg Continued installing the shear wall panels at Elev. 5,6 (3rd Floor) Facing West (800x600).jpg Installing rebar mats at Elev. 1,2,3 (3rd Floor) Facing East (800x600).jpg Installing rebar mats at Elev. 1,2,3 (3rd Floor) Facing South-West (800x600).jpg Performing water test at water service pipes Facing West (800x600).jpg